Form 7460-1 for ASN 2016-ASW-4387-OE

faa.gov Tools: Printer graphicPrint this page
Overview
Study (ASN): 2016-ASW-4387-OE
Prior Study:
Status: Determined
Letters: Determination
Supplemental Form 7460-2: Please login to add a Supplemental Form 7460-2.
   
   
Received Date: 04/27/2016
Entered Date: 04/27/2016
Completion Date: 05/24/2016
Expiration Date: 11/24/2017
   
Sponsor Information     Sponsor's Representative Information
Sponsor: P&J Arcomet, LLC
Attention Of: Brian Burres
Address: 3060 Keller Hicks Rd.
Address2:
City: Keller    
State: TX    
Postal Code: 76244
Country: US
Phone: 817-689-1608  
Fax: 817-741-5313
   
   
Representative: P&J Arcomet, LLC
Attention Of: Brian Burres
Address: 1090 N. Interstate 45
Address2:
City: Palmer    
State: TX    
Postal Code: 75159
Country: US
Phone: 817-689-1608  
Fax: 817-741-5313
   
Construction Info     Structure Summary
Notice Of: CONSTR
Duration: TEMP    (Months: 14    Days: 0)
Work Schedule: 05/14/2016  to  07/14/2017
Date Built:
   
   
Structure Type: Crane
Structure Name: Hampton Inn & Suites Downtown Ft. Worth, TX
FCC Number:
   
Structure Details     Height and Elevation
Latitude (NAD 83): 32° 45' 08.00" N
Longitude (NAD 83): 97° 19' 44.00" W
Horizontal Datum: NAD 83
Survey Accuracy: 4D
Marking/Lighting: None
Other Description:
Current Marking/Lighting: N/A Proposed Structure
Current Marking/Lighting Other Description:
Name:
City: Fort Worth
State: TX
Nearest County: Tarrant
Nearest Airport: FTW
Distance to Structure: 26653.93 feet
On Airport: No
Direction to Structure: 157.32°
Description of Location: site is location of old building demolished for new construction of Hampton Inn Hotel. This site is directly to the east of the Fort Worth Convention Center located between Jones & Calhoun Streets.
Description of Proposal: A tower crane will temporarily be needed to construction this new hotel The hotel is not tall and is surrounded by taller structures in the downtown Fort Worth district. Please see attached elevations pages of hotel. Please reference 2016-AIS-815-OE for permanent structure study.
   
 
Proposed
DNE
DET
Site Elevation:
604
Structure Height:
167
0
167
Total Height (AMSL):
771
0
771

Frequencies
Low Freq High Freq Unit ERP Unit