Form 7460-1 for ASN 2016-ANE-2086-OE

faa.gov Tools: Printer graphicPrint this page
Overview
Study (ASN): 2016-ANE-2086-OE
Prior Study:
Status: Determined
Letters: Determination
7460-2 Forms: 11/06/2017 | 06/04/2019 | 12/16/2019
Supplemental Form 7460-2: Please login to add a Supplemental Form 7460-2.
   
   
Received Date: 05/12/2016
Entered Date: 05/12/2016
Completion Date: 11/17/2016
Expiration Date: 05/17/2018
   
Sponsor Information     Sponsor's Representative Information
Sponsor: Bulfinch Congress Holdings, LLC
Attention Of: Thomas O'Brien
Address: c/o The HYM Investment Group
Address2: One Congress Street - 10th Floor
City: Boston    
State: MA    
Postal Code: 02114
Country: US
Phone: 617-248-8905  
Fax:
   
   
Representative: VHB
Attention Of: Howard Moshier
Address: 99 High Street
Address2: Floor 10
City: Boston    
State: MA    
Postal Code: 02110
Country: US
Phone: 617-607-2924  
Fax:
   
Construction Info     Structure Summary
Notice Of: CONSTR
Duration: PERM    (Months: 0    Days: 0)
Work Schedule: 10/01/2016  to  10/31/2018
Date Built: 12/13/2019
   
   
Structure Type: Building
Structure Name: GCG WPB1 Res Tower - Point 7 (Highest)
FCC Number:
   
Structure Details     Height and Elevation
Latitude (NAD 83): 42° 21' 43.51" N
Longitude (NAD 83): 71° 03' 34.86" W
Horizontal Datum: NAD 83
Survey Accuracy: 4D
Marking/Lighting: Red lights
Other Description:
Current Marking/Lighting: N/A Proposed Structure
Current Marking/Lighting Other Description:
Name:
City: Boston
State: MA
Nearest County: Suffolk
Nearest Airport: BOS
Distance to Structure: 14407.38 feet
On Airport: No
Direction to Structure: 268.77°
Description of Location: The Project is located at the Government Center Garage on Sudbury Street in Boston, MA. The Project is located approximately 1.9 miles or 1.7 nm from Runway 14 at Logan International Airport. The garage is located within the Massport Composite Surfaces Downtown Zone Area.
Description of Proposal: The Project is a 45-story (plus mechanical) residential building constructed on the southwest corner of the existing Government Center Garage. The building will be of glass, metal, and masonry facade.
   
 
Proposed
DNE
DET
Site Elevation:
21
Structure Height:
539
200
539
Total Height (AMSL):
560
221
560

Frequencies
Low Freq High Freq Unit ERP Unit