Tower cranes for the construction of the Marriott Cesar Chavez Hotel which was submitted under Aeronautical study no. 2017-ASW-2237-OE
Description of Proposal:
Two tower cranes with tallest being 485' above the site elevation and located within same site 120'-6 away from each other. Liebherr 550 EC-H 20 Litronic & Terex SK 415-10 models.