Owner of Structure: |
MCAS Winthrop LLC |
|
|
|
|
Latitude: |
42° 21' 15.52" N |
Longitude: |
71° 03' 27.12" W |
Horizontal Datum: |
NAD 83 |
Site Elevation (SE): |
19 (nearest foot) |
Structure Height (AGL): |
701 (nearest foot) |
Site Elevation Determined By: |
Actual Pre-Built Survey |
|
|
Address: |
|
Address 2: |
|
City: |
Boston |
State: |
MA |
|
|
|
|
Construction
Start Date: |
10/25/2018 |
Estimated End
Date: |
08/01/2021 |
Greatest Height Reached
Date: |
|
|
|
Abandon Date: |
|
Dismantled Date: |
|
M&L Change Date: |
|
Extension Request Date: |
|
|
|
|
|
|
|
FCC Permit
Applied Date: |
|
FCC Permit Issued
Date |
|
|
|
|
|
Marking and Lighting: |
Red lights |
Estimated Date ADLS will be installed: |
|
Estimated Date ADLS will be operational: |
|
Date ADLS enabled: |
|
Date ADLS discontinued: |
|
|
|
|
|
Latest Supplemental Case Note: |
|
Comments: |
Update to construction end date. |
|
|
|
|